Selected public-agency experience
Projects with documented context.
Explore a documented water-main project and two public-agency awards. Each profile identifies the milestone supported by the available records.
Coalinga · PW 22-022
Pleasant Ave. Water Main Replacement
Documented milestone: substantial completion, September 22, 2023.
DG Construction Inc. performed this water-main replacement project in Coalinga, California. A City-signed certificate establishes substantial completion effective September 22, 2023, with remaining closeout items. This milestone does not establish final acceptance.
Planning a water-main project? Share the current plan-and-profile sheets, connection limits, pipe specifications, restoration scope and bid deadline so DGCI can review your requirements.
Documented milestone: council award, September 13, 2023.
The City of Kerman’s September 14, 2023 award letter confirms the council award to DG Construction. This profile records the award; it does not claim final acceptance or describe unverified construction results.
For a recharge or drainage bid package, identify the proposed utility systems, site constraints, construction limits and responsibilities between trades. DGCI can review the requested scope with your team.
Documented milestone: council award, September 6, 2023.
The Town of Mammoth Lakes’ September 11, 2023 notice confirms the council award to DG Construction. The notice distinguishes award from contract execution; construction completion is not asserted in this profile.
For a site-infrastructure opportunity, include the utility drawings, access requirements, proposed phasing and restoration boundaries. These details help define the work requested in an estimate.
The gallery below shows DGCI job photography across multiple projects. Photographs are not assigned to these named projects without a confirmed project match.
New C900 Water Main InstallationADA compliant flatworkNew Agricultural Sciences BuildingNew Site Septic SystemNew C900 Water MainNew watermain C900Existing HMA PrepNew WatermainBackfill for Contech Storm SolutionsNew WatermainBackfill for Storm StructureWatermain Kicker and Thrust Block PrepNew sewer connection to existing facilitiesDry utilities installNew Contech Storm Detention System InstallationFine grading prior to HMA placementFire riserDeep pit excavation for new Contech Storm Detention SystemTrenchwork prepIrrigation Install at Custom Monterey Beach HomeNew fire lineDry utilities placementPad work at mountain projectNew utility vault installationNew double MH installNew watermain install for townStorm water pond retrofit rebuildNew watermain installationWatermain trench backfillTrench backfill operations
Let’s build what’s next.
Send your utility scope, project location, and bid deadline.
Allow optional Google Analytics cookies to help DGCI improve this website? We measure page visits and successful estimate requests, without sending your form answers. You can change this choice below at any time.